Novikov Restaurant Mayfair

 

From the initial consultation with the stone suppliers we worked closely with them on the manufacturing and installation of the bespoke slate wall. The project took 7 months in total.

From the initial consultation to the final install welsh slate products can work closely with private individuals or architects to achieve the goals set out.

The brief was initially a honed wall but the specification changed to riven natural finish which in itself caused a few problems due to the nature of the material, the pieces on the wall ranged from small triangle up to large pieces
1400mm x 1400mm x 30mm the size of these pieces proved quite challenging to fix.